Preskoči na sadržaj
    ← All services

    Under a CSL2 notice — or one customer escalation away from a line stop?

    Escalation Response — Controlled Shipping & Quality Wall

    Escalation response is third-party containment that protects your customer the moment a quality escape threatens their line. It covers Controlled Shipping Level 1 and 2 (CSL1/CSL2), a quality wall or firewall, GP-12 early-production containment and 0-km sorting — independent screening with OEM-format reporting until verified exit criteria let you stand down controlled shipping.

    Containment plan within 24 hours · mobilized worldwide · engagements scoped per project.

    When you need this

    • Your customer has issued a CSL1 or CSL2 (controlled shipping) notice.
    • A defect has escaped to the customer line and a 24–48h containment plan is demanded.
    • Repeat escapes have triggered a quality wall / firewall requirement.
    • A new or redesigned part needs GP-12 early-production containment.
    • Your internal team is stretched and cannot staff 100% screening on top of production.

    How it works

    1. 1

      Mobilize

      A containment plan is produced within 24 hours of engagement and screeners are deployed — on-site at your plant, at the customer, or at a third location — anywhere in the world.

    2. 2

      Define the criteria

      Defect definitions, boundary samples and an inspection instruction are agreed with the customer so every part is judged against the same standard.

    3. 3

      100% screen

      Visual, dimensional and functional screening of suspect stock with clear OK / NOK segregation, quarantine of rejects and full traceability.

    4. 4

      NOK flow & reporting

      Rejects are routed to rework or scrap, daily ppm and quantities are reported in the customer’s format, and 8D root-cause work runs in parallel.

    5. 5

      Facilitate exit

      Exit-criteria evidence is assembled and presented so controlled shipping can be lifted — and the permanent corrective action is verified to keep it lifted.

    Exit criteria

    Competitors stop at the screening. We define — and prove — the criteria that end the engagement, so it has a defensible finish line.

    • A defined number of consecutive clean shipments (typically agreed with the customer SQ team).
    • A closed 8D with verified root cause and effective permanent corrective action.
    • Updated control plan / PFMEA reflecting the corrective action.
    • Customer SQ sign-off on the exit package and removal of the CSL status.

    What we deliver

    • CSL1 Third-Party Inspection
    • CSL2 Controlled Shipping
    • Quality Wall / Firewall
    • GP-12 Early Production Containment
    • 0-km Sorting & Screening
    • 8D Root-Cause & Exit-Criteria Facilitation

    Frequently asked questions

    Software

    Run audits and 8D digitally — offline-first, AEI-guided.

    Qualiteh Audit

    Talk to an engineer who has solved this before

    Tell us what you are facing. We will map a realistic plan — and mobilize fast if the line is at risk.

    Discuss Escalation Response